Skip Ribbon Commands
Skip to main content

Because of a lapse in government funding, the information on this website may not be up to date, transactions submitted via the website may not be processed, and the agency may not be able to respond to inquiries until appropriations are enacted. The NIH Clinical Center (the research hospital of NIH) is open. For more details about its operating status, please visit cc.nih.gov. Updates regarding government operating status and resumption of normal operations can be found at opm.gov.

ORF Home > Project Resources > Project Tools > IC Moves Checklist

IC Moves Checklist

back

Linda Adams, Administrative Officer at NHGRI, developed and refined this checklist in preparation for a large move into new space. It lists, in alphabetical order, the things AOs should consider tracking to ensure a successful move.

Prior to setting move date:
  • Address/phone number changes
  • Airports
  • Hallway/break area furniture
  • Bulletin boards/white boards
  • Business cards
    Cards must follow instructions in the NIH Manual Issuance at http://www1.od.nih.gov/oma/manualchapters/contracts/6307-4/
  • Cable TV
  • Conference room order
  • Copiers and furniture
  • Credit card address changes
  • CSS
  • Facility Information Management System
  • Furniture
  • Gases
    How will this be coordinated?
    Who is the contact?
  • Glass tabletops and desktops
  • Hazardous Chemicals Funding Memo
    For assistance call 301-496-7990
  • In-house web page address changes
  • Journals
    Where do they go?
  • LAN switches and other equipment
    Order switches and other equipment for LAN closets
  • Lobby guidelines
    Who will prepare this?
  • Locks
  • Locker assignments
  • Mail boxes/codes
  • Movers, including Medical Equipment and Maintenance
    Get estimates.
  • NIH NED changes
  • Open House
  • Parking
  • Proximity Locks
    Make sure staff are coded to enter and use.
  • Recycling containers
  • Signs for phones
  • Stock delivery codes
  • Telephones
  • Wireless communications
When move date is set:
  • Check furniture and all other deliveries; coordinate with dock master.
  • Notify chemical movers.
  • Notify general movers of date.
  • Notify mail room.
  • Make parking space changes.
  • Notify facility people for loading dock usage.
  • Check to see that alarm system is working.
  • Check to see that proximity locks are working.
  • Notify LAN support to check connections and install switches.
  • Buy door stops, wedges to keep doors open during move.
  • Call MAPB about signage.
  • Pick up proximity cards.
  • Order refrigerators and microwaves for break rooms.

back


 
This page was last updated on Dec 06, 2012